Assistant Director IAVT
PD Dr.-Ing.
Gerald Weigert
Phone:
(0351) 463 36439
Office:
GLB 1-157
PD Dr.-Ing. Gerald Weigert studied Information Technology at the Technische Universität Dresden from 1971 to 1975. From 1975 to 1982 he worked as a scientific assistant at the Department “Measurement and Speech Communication” and received there his PhD in the field of automatic speech recognition in 1984. From 1982 to 1988 he was a staff member in R&D at Robotron Elektronik Dresden. Since 1988 he has been working as an assistant professor at the later Electronics Technology Laboratory, now the Electronics Packaging Laboratory. Dr. Weigert made scientific contributions to the field of process accompanying simulation of manufacturing processes, to the development of discrete event simulation systems and simulation-based optimisation algorithms.
Back
2017
Maleck, C.; Weigert, G.; Pabst, D.; Stehli, M.
Robustness analysis of an MIP for production areas with time constraints and tool interruptions in semiconductor manufacturing
50th Winter Simulation Conference (WSC), 3-6 Dec. 2017, Las Vegas, NV, USA
2016
Doleschal, D.; Nieke, G.; Weigert, G.; Klemmt, A.
A CP Approach for Planning Lot Release Dates in a Supply Chain of Semiconductor Manufacturing
Proceedings of the 2016 Winter Simulation Conference, Pages: 2633-2644, Washington, D.C., December 11-14, 2016
Nieke, G.; Doleschal, D.; Weigert, G.
Mathematical Methods for Aanalyzing and Optimizing Production Lines and Supply Chains in Semiconductor Industry
Proceedings of the 39th Spring Seminar on Electronics Technology, Seiten: 336-341, Pilsen, Czech Republic, May 18-22, 2016
2015
Doleschal, D.; Weigert, G.
Scheduling under Consideration of the Machine Capability
Tagungsband der 16. Fachtagung Simulation in Produktion und Logistik, Seiten: 397-406, Dortmund, September 23-25, 2015
Doleschal, D.; Weigert, G.; Klemmt, A.
Yield Integrated Scheduling Using Machine Condition Parameter
Proceedings of the Winter Simulation Conference, Seiten: 2953-2963
Huntington Beach, California, December 6-9 2015
2014
Lange, J.; Doleschal, D.; Weigert, G.; Klemmt, A.
Scheduling Preventive Maintenance Tasks with Synchronization Constraints for Human Resources by a CP Modeling Approach
Proceedings of the Winter Simulation Conference, Washington, December 2014
2013
Doleschal, D.; Lange, J.; Weigert, G.
A Simulation Study on a Mixed Integer Based Scheduler for Secondary Resources in a Parallel Machine Work Center Problem Based on a High Mix – Low Volume Production
Proceedings of the 22th International Conference on Production Research, Iguassu Falls, Brazil,
Doleschal, D.; Weigert, G.; Klemmt, A.; Lehmann, F.
Advanced Secondary Resource Control in Semiconductor Lithography Areas: From Theory to Practice
Proceedings of the 2013 Winter Simulation Conference, Washington D.C., USA
Lange, J.; Weigert, G.; Klemmt, A.; Doherr, P.
Scheduling Maintenance Tasks with Time-Dependent Synchronization Constraints by a CP Modeling Approach
Proceedings of the Winter Simulation Conference 2013, Seiten: 3642-3653
Weigert, G.
Operating Curves of Manufacturing Systems: A Theoretical Discourse
Proceedings of the 23th International Conference on Flexible Automation and Intelligent Manufacturing, Seiten: 874-884 Porto, Portugal, 2013
Weigert, G.
Leistungsbewertung von Fertigungssystemen durch normierte Betriebskennlinien
Tagungsband der 15. Fachtagung Simulation in Produktion und Logistik, Seiten: 447-457, Paderborn, 2013
2012
Doleschal, D.; Lange, J.; Weigert, G.; Klemmt, A.
Improving Flow Line Scheduling by Upstream Mixed Integer Resource Allocation in a Wafer Test Facility
Proceedings of the 2012 Winter Simulation Conference, Berlin, Germany
Lange, J.; Keil, S.; Eberts, D.; Weigert, G.; Lasch, R.
Introducing the Virtual Time Based Flow Principle in a High-Mix Low-Volume Wafer Test Facility and Exploring the Behavior of its Key Performance Indicators
Proceedings of the 2012 Winter Simulation Conference, Berlin, Germany
Doleschal, D.; Lange, J.; Weigert, G.
Mixed-integer-based capacity planning improves the cycle time in a multistage scheduling system
22nd International Conference on Flexible Automation and Intelligent Manufacturing
Lange, J.; Bergs, F.; Weigert, G.; Wolter, K.-J.
Simulation of capacity and cost for the planning of future process chains
International Journal of Production Research
2011
Klemmt, A.; Weigert, G.
An Optimization Approach for Parallel Machine Problems with Dedication Constraints: Combining Simulation and Capacity Planning
Winter Simulation Conference, Proceedings pp. 1986-1998, Phoenix, Arizona, December 12-14, 2011
Horn, S.; Ameling, M.; Weigert, G.; Winkler, M.
Increasing resource-efficiency in production with energy constraints by discrete-event simulation
21th International Conference on Production Research, Stuttgart, July 31 - August 4, 2011
Doleschal, D.; Klemmt, A.; Weigert, G.
Iterative simulation-based optimization for parallel batch scheduling problems
34th International Spring Seminar on Electronics Technology (ISSE)
Lange, J.; Bergs, F.; Weigert, G.; Wolter, K.-J.
Simulation of Capacity and Cost for Planning of Future Process Chains
21th International Conference on Production Research, Stuttgart, Germany, July 31 - August 4, 2011
Klemmt, A.; Lange, J.; Weigert, G.; Beier, E.; Werner, S.
Combination of simulation and capacity optimization for detailed production scheduling in semiconductor manufacturing
Proceedings of the 21th International Conference on Flexible Automation and Intelligent Manufacturing, Taichung, Taiwan, pp. 603-610
Klemmt, A.; Weigert, G.; Werner, S.
Optimisation approaches for batch scheduling in semiconductor manufacturing
European Journal of Industrial Engineering, Vol. 5, Nr. 3, pp. 338-359
Henlich, T.; Weigert, G.; Klemmt, A.
Modellierung und Optimierung von Montageprozessen
Simulation und Optimierung in Produktion und Logistik, März, L.; Krug, W.; Rose, O.; Weigert, G. (Hrsg.), Springer
Klemmt, A.; Horn, S.; Weigert, G.
Simulationsgestützte Optimierung von Fertigungsprozessen in der Halbleiterindustrie
Simulation und Optimierung in Produktion und Logistik, März, L.; Krug, W.; Rose, O.; Weigert, G. (Hrsg.), Springer
2010
Weigert, G.; Rose, O.; Gocev, P.; Mayer, G.
Kennzahlen zur Bewertung logistischer Systeme
14. ASIM Fachtagung Simulation in Produktion und Logistik, S. 599 - 606, Karlsruhe, 6.-8. Oktober, 2010
Weigert, G.; Rose, O.
Stell- und Zielgrößen
Simulation und Optimierung in Produktion und Logistik, S. 29 - 40, Springer Verlag, 2010
März, L.; Krug, W.; Rose, O.; Weigert, G. (Hrsg.)
Simulation und Optimierung in Produktion und Logistik
Berlin, Heidelberg, Springer Verlag, 2010
Klemmt, A.; Weigert, G.; Werner, S.
Optimisation approaches for batch scheduling in semiconductor manufacturing
European Journal of Industrial Engineering, pp. 338-359, 2010
Klemmt, A.; Horn, S.; Weigert, G.
Simulationsgestützte Optimierung von Fertigungsprozessen in der Halbleiterindustrie
Simulation und Optimierung in Produktion und Logistik, S. 49 - 64, Springer Verlag, 2010
Henlich, T.; Weigert, G.; Klemmt, A.
Modellierung und Optimierung von Montageprozessen
Simulation und Optimierung in Produktion und Logistik, S. 79 - 92, Springer Verlag, 2010
Lange, J.; Klemmt, A.; Weigert, G.
Robust dispatch strategies for highly variant process times
Proceedings of the 20th International Conference on Flexible Automation and Intelligent Manufacturing, Oakland, California USA
Klemmt, A.; Lange, J.; Weigert, G.;Lehmann, F.; Seyfert, J.
A Multistage Mathematical Programming Based Scheduling Approach for the Photolitography Area in Semiconductor Manufacturing
2010 Winter Simulation Conference, Baltimore, Maryland, USA
2009
Weigert, G.; Henlich, T.; Klemmt, A.
Modeling and Optimization of Assembly Processes
20th International Conference on Production Research Shanghai, China, August 2-6, 2009
Klemmt, A.; Weigert, G.; Almeder, C.; Mönch, L.
A Comparison of MIP-based Decomposition Techniques and VNS Approaches for Batch Scheduling Problems
2009 Winter Simulation Conference, Austin, Texas, USA, pp. 1686-1694
Lange, J.; Klemmt, A.; Weigert, G.
Generic Visualization of Technological Process Flows
32nd International Spring Seminar on Electronics Technology, ISSE 2009, Brno, Czech Republic, May 13-17, Abstract pp. 54-55
Klemmt, A.; Lange, J.; Weigert, G.
Work center optimization methods for semiconductor manufacturing
Proceedings of the 19th International Conference on Flexible Automation and Intelligent Manufacturing (FAIM), Teesside, UK, pp. 1325-1332
Klemmt, A.; Horn, S.; Weigert, G.; Wolter, K.-J.
Simulation-based Optimization vs. Mathematical Programming: A Hybrid Approach for Optimizing Scheduling Problems
Journal of Robotics and Computer Integrated Manufacturing, Vol. 25, pp. 917-925
Weigert, G.; Klemmt, A.; Horn, S.
Design and Validation of Heuristic Algorithms for Simulation-Based Scheduling of a Semiconductor Backend Facility
International Journal of Production Research, Vol. 47, Issue 8 January 2009, pages 2165 - 2184
2008
Weigert, G.; Henlich, T.
Simulation-based scheduling of assembly operations
International Journal of Computer Integrated Manufacturing, pp. 325-333, 2008
Klemmt, A.; Horn, S.; Weigert, G.; Hielscher, T.
Simulation-based and Solver-based Optimization Approaches for Batch Processes in Semiconductor Manufacturing
2008 Winter Simulation Conference, Miami, Florida USA, pp. 2041-2049
Klemmt, A.; Horn, S.; Weigert, G.
Analysis and Coupling of Simulation-based Optimization and MIP Solver Methods for Scheduling of Manufacturing Processes
Proceedings of the 18th International Conference on Flexible Automation and Intelligent Manufacturing (FAIM), Skövde, Schweden, pp. 1146-1153
Klemmt, A.; Weigert, G.
3D-Visualisierung heuristischer Optimierungsalgorithmen
Simulation and Visualization, pp. 167-180
Weigert, G.; Henlich, T.; Klemmt, A.
Methoden zur Modellierung und Optimierung von Montageprozessen
Simulation in Produktion und Logistik 2008. Kassel, Germany, 1.-2. Oktober 2008, Tagungsband zur 13. ASIM-Fachtagung S. 479 - 488
Weigert, G.; Henlich, T.
Using Petri Nets for DES modeling and optimization of assembly processes
18th International Conference on Flexible Automation and Intelligent Manufacturing, Skövde, Sweden, June 30-July 2 2008. pp. 1228-1235
2007
Wang, K.-J.; Lin, J.; Weigert, G.
Agent-based interbay system control for a single-loop semiconductor manufacturing fab
Production Planning & Control, Volume 18, Issue 2 March 2007 , pp. 74 - 90, Taylor & Francis
Klemmt, A.; Horn, S.; Beier, E., Weigert, G.
Investigation of modified heuristic algorithms for simulation-based optimization
30th International Spring Seminar on Electronics Technology, ISSE 2007, Cluj-Napoca, Romania, May 9-13, 2007, Abstract pp. 42-43
Weigert, G.; Henlich, T.
Simulation-based scheduling of assembly operations and logistics
17th International Conference FAIM'07, Flexible Automation & Intelligent Manufacturing, Philadelphia, Pennsylvania USA, June 18-20 2007, Proceedings pp. 124-131
Weigert, G.; Klemmt, A.; Horn, S.
A Multistage Optimization Approach for a Semiconductor Facility
19th International Conference on Production Research, Valparaiso, Chile, July 29-August 2
2006
Horn, S.; Weigert, G.; Beier, E.
Heuristic Optimization Strategies for Scheduling of Manufacturing Processes
29th International Spring Seminar on Electronics Technology, IEEE Catalog Number: 06EX1493C, St. Marienthal, Germany, May 10th to 14th, 2006, pp. 435 - 440,
Weigert, G.; Horn, S; Jähnig,T.; Sebastian, W.
Automated Creation of DES Models in an Industrial Environment
16th International Conference FAIM'06, Flexible Automation & Intelligent Manufacturing, Limerick, June 26th to 28th 2006, pp. 311 - 318
Weigert, G.; Horn, S., Werner, S.
Optimization of Manufacturing Processes by Distributed Simulation
International Journal of Production Research, Volume 44 Numbers 18-19, September 15th - October 1st 2006, pp. 3677 - 3692
Horn, S.; Weigert, G.; Schönig, P.; Thamm, G.
Application of Simulation-based Scheduling in a Semiconductor Backend Facility
1st Electronics Systemintegration Technology Conference, Dresden, Germany, September, 5th to 7th, 2006, pp. 1122 - 1126
Weigert, G.
Theorie und Praxis der simulationsgestützten Ablaufplanung
Simulation in Produktion und Logistik 2006, Kassel, 26.-27. September 2006, 12. ASIM-Fachtagung S. 253 - 262
Horn, S.; Weigert, G.; Werner, S.
Real-time Scheduling by Parallel and Distributed Simulation over IP Multicast
Journal of Robotics and Computer-Integrated Manufacturing, Volume 22, Issues 5-6, (October-December 2006), pp. 475-484
Weigert, G.; Werner, S.; Horn, S.
Simulation Aided Optimisation of Manufacturing Processes in University Education
International Journal of Manufacturing Technology and Management 2006 - Vol. 9, No.3/4, pp. 372 - 386
Horn, S.; Weigert, G.; Werner, S.; Jähnig, T.
Simulation Based Scheduling System in a Semiconductor Backend Facility
2006 Winter Simulation Conference, Monterey, California USA, December 2006
Sauer, W.; Oppermann, M.; Weigert, G.; Werner, S.; Wohlrabe, H.; Wolter, K.-J.; Zerna, T.
Electronics Process Technology - Production, Modelling, Simulation and Optimisation
Springer-Verlag London, Limited, 2006
2005
Weigert, G.; Horn, S.; Werner, S.
Data Coupling Strategies in Production Environments
28th International Spring Seminar on Electronics Technology, ISSE 2005. Wiener Neustadt, Austria, May 18 - 22, 2005, Proceedings (CD)
Weigert, G.; Horn, S.; Werner, S.
Real Time Scheduling by Parallel and Distributed Simulation over IP Multicast
15th International Conference FAIM'05, Flexible Automation & Intelligent Manufacturing. Bilbao, July 18-20, 2005, Proceedings pp. 305 - 312
Weigert, G.; Horn, S.; Werner, S.
Optimization of Manufacturing Processes by Distributed Simulation
18th International Conference on Production Research, Salerno, August 1-4, 2005, Proceedings (CD)
Weigert, G.
Backend-Scheduling bei Infineon
Vortrag beim Industriebeirat, Gornsdorf, 29.09.2005
Weigert, G.
Simulation vs. scheduling - just a question of the viewpoint?
Dagstuhl-Seminar 05281, 10. -15. 07. 2005: Simulation & Scheduling: Companions or Competitors for Improving the Performance of Manufacturing Systems
2004
Horn, S.; Weigert, G.; Werner, S.
Optimization Toolkit for Scheduling Optimization in Semiconductor Back-Ends
IEEE CPMT Proceedings of the 27th International Spring Seminar on Electronics Technology, (Annual School Lectures, Vol 24, IEEE Cat.No. 04EX830), ISBN 0-7803-8422-9 Sofia, Bulgaria, May 14-16, 2004, pp. 266-271
Weigert, G.; Werner, S.; Horn, S.
Simulation of Manufacturing Processes in University Education - the Theory Becomes Clearer
14th International Conference FAIM'04, Flexible Automation & Intelligent Manufacturing, Toronto, July 2004, Proceedings pp. 1288 - 1294, ISBN 0-662-37241-7
Weigert, G.; Werner, S.
Simulationsgestützte Maschinenbelegungsplanung in der Bohrerei eines Leiterplattenherstellers (engl. "Scheduling by Simulation in the Drilling Facility of a PCBManufacturer")
11. ASIM-Fachtagung "Simulation in Produktion und Logistik" Berlin, 4./5. Oktober, Tagungsband S. 229 - 238 ISBN 3-8167-6640-4
2003
Weigert, G.
Modellierung von Fertigungssystemen mit dem simcron MODELLER
6. Workshop "Simulation und Leistungsbewertung in Fertigungssystemen", Würzburg, 13. und 14. November 2003
Weigert, G.
Simulation von Fertigungsprozessen und virtuelle Ereignisse
Ehrenkolloquium Elektronik-Technologie, Dresden, 9. Oktober 2003
Sauer, W. (Herausgeber); Oppermann, M.; Weigert, G.; Werner, S.; Wohlrabe, H.; Wolter, K.-J.; Zerna, T.
Prozesstechnologie der Elektronik - Modellierung, Simulation und Optimierung der Fertigung
1. Auflage - München: Fachbuchverlag Leipzig im Carl Hanser Verlag, 2003
2002
Werner, S.; Kellner, M.; Schenk, E.; Weigert, G.
Just-in-sequence Material Supply - A Simulation Based Solution in Electronics Production
In: 12th International Conference FAIM'02, Flexible Automation & Intelligent Manufacturing, Dresden, July 2002, Proceedings p. 461-468, ISBN 3-486-27036-2
Werner, S.; Weigert, G.
Process Accompanying Simulation - A General Approach for the Continuous Optimization of Manufacturing Schedules in Electronics Production
In: 2002 Winter Simulation Conference., San Diego, California USA, December 2002, Proceedings p. 1903-1908
Weigert, G.; Werner, S.; Kellner, M.
Fertigungsplanung durch prozessbegleitende Simulation, (Manufacturing Planning by Process Accompanied Simulation)
In: 10. ASIM-Fachtagung "Anwendung der Simulationstechnik in Produktion und Logistik", Duisburg, März 2002, Tagungsband S. 42-51, ISBN 3-936150-16-8
2001
Werner, S.; Weigert, G.; Hampel, D.
Production Scheduling by Simulation
In: IASTED International Conference on Applied Simulation and Modelling. Marbella, Spain, September 2001, Proceedings p. 149-153, ISBN 0-88986-311-3
Werner, S.; Weigert, G.; Hampel, D.
A Practical Application of Scheduling by Simulation
In: 11th International Conference FAIM'01, Flexible Automation & Intelligent Manufacturing. Dublin, Ireland, July 2001, Proceedings p. 716-724, ISBN 1-872-32734-6
Weigert, G.; Werner, S.; Hampel, D.
Simulation and Optimization - a Practical Application
In: 16th International Conference on Production Research. Prague, Czech Republic, July 2001, Proceedings F2.6, ISBN 80-02-01438-3
2000
Weigert, G.; Werner, S.; Hampel, D.; Heinrich, H.; Sauer, W.
Multi Objective Decision Making - Solutions for the Optimization of Manufacturing Processes
FAIM 2000 (International Conference on Flexible Automation and Intelligent Manufacturing), University of Maryland at Collage Park, Collage Park, Maryland, USA, June 26-28, 2000., Proceedings, Vol. 1, p. 487-496, ISBN 0-9701053-0-4
Weigert, G.; Werner, S.; Hampel, D.
ROSI - Ein Programmsystem zur Simulation und Optimierung von Fertigungsprozessen
Berlin, März 2000, Tagungsband S. 463-472, ISBN 3-8167-5537-2
1999
Weigert, G.; Werner, S.; Hampel, D.
Simulation and Optimization of Manufacturing Processes
The 5th International Symposium for Design and Technology in Electronic Modules, Bucharest, 23.-26.9.1999, Proceedings p. 33-38
Weigert, G.; Werner, S.; Sauer, W.
Adaptive Simulation Systems for Reducing Uncertainty of Predictions
9th Conference on Flexible Automation and Intelligent Manufacturing (FAIM), Tilburg 23.-25.6.1999, Proceedings p. 691-701
Weigert, G.; Werner, S.; Hampel, D.
Simulation and Optimization of Manufacturing Processes
22nd ISSE, Dresden-Freital 18.-22.5.1999, Proceedings p. 31-35
1998
Weigert, G.; Hampel,D.; Sauer, W.
Scheduling of FMS . Application of an Open Optimization System
In: 8th International Conference FAIM98, Flexible Automation & Intelligent Manufacturing. Portland, Oregon, USA, July 1998, Proceedings S. 771-780
Weigert, G.; Sauer, W.
Ablaufoptimierung in flexiblen Fertigungssystemen
Dresdner Innovationsgesprache 1998, 5. . 6. Mai 1998
1997
Sauer, W.; Weigert, G.; Hampel, D.
Optimization of Manufacturing Processes by Process Accompanied Simulation.
In: European Conference on Integration in Manufacturing. Dresden, Germany, September 1997, Proceedings S. 335-342.
Sauer, W.; Weigert, G.; Hampel, D.
An Open Optimization System for Controlling of Manufacturing Processes.
In: 7th International Conference FAIM´97, Flexible Automation & Intelligent Manufacturing. Middlesbrough, England, June 1997, Proceedings S. 261-268.
Sauer, W.; Weigert, G.; Goerigk, P.
Real Time Optimization of Manufactoring Processes by Synchronized Simulation.
In: International Journal of Flexible Automation and Integrated Manufactoring 4 (1996), Nr. 1, S. 15-27
1996
Weigert, G.; Schulze, R.
Genetic Algorithms Schedule Todays Manufacturing Process
2nd International Mendel Conference on Genetic Algorithms, Brno, Tschechien, Juni 1996, Tagungsband, S. 192 -196
Sauer, W.; Weigert, G.; Goerigk, P.
Ein lernfähiges Simulationssystem zur Planung von flexiblen Fertigungssystemen
10. Symposium Simulationstechnik, Dresden, September 1996
Sauer, W.; Weigert, G.; Goerigk, P.
Simulationsgestützte optimale Steuerung flexibler Fertigungssysteme
7. Internationales DAAAM Symposium, Wien, Österreich, 17. -19. Oktober 1996, Tagungsband, S. 389 - 390
Sauer, W.; Weigert, G.; Goerigk, P.
A Learnable Simulation System for Scheduling FMS
6th International Conference FAIM '96, Flexible Automation &Intelligent Manufacturing, Atlanta, USA, Mai 1996, Tagungsband, S. 839-848
Sauer, W.; Weigert, G.
Optimization of Manufacturing Processes by Object-oriented Simulation
Simulation and Optimization '96, Gold Coast, Australien, Mai 1996, Tagungsband (auf CDROM)
1995
Sauer, W.; Weigert, G.; Goerigk, P.
Ein intelligentes Simulationssystem für die Fertigungssteuerung
6. Internationales DAAAM Symposium, Krakow, 26.-28. Oktober, S. 299-300
Sauer, W.; Weigert, G.; Goerigk, P.
Real Time Optimization of Manufacturing Processes by Synchronized Simulation
5th International Conference FAIM '95, Flexible Automation & Intelligent Manufacturing, Stuttgart, 28.-30. Juni 1995,S.271-282
1994
Weigert, G.; Hansen, O.; Goerigk, P.
XROSI - a System for Simulation and Optimization of Manufacturing Processes
Vortrag, 17. ISSE, Weißig b. Dresden
Weigert, G.; Hansen, O.
Probleme beim Einsatz von Simulationssystemen in der Fertigungssteuerung
Vortrag, Simulation und Integration, Magdeburg, März 1994
Weigert, G.
ROSI/XROSI - a Simulation System for Manufacturing Processes
Vortrag, Texas A&M University, USA, März 1994
1992
Weigert, G.; Hansen, O.
Optimale Ablaufsteurung von Fertigungsprozessen durch synchronisierte Simulation auf der Leitstandsebene
Workshop zum SMT-Kolloquium des IET, TU Dresden, 7/92
Weigert, G.
Simulationsmethoden für die optimale Steuerung des Bestückungsprozesses
SMT-Kolloquium des IET, TU Dresden, 7/92
Hansen, O.; Weigert, G.
Prozeßprognose durch Synchronisation von Fertigungsprozeß und Simulation
SMT-Kolloquium des IET, TU Dresden, 7/92
Back