Scientists

Dipl.-Math.
Dirk Schloß
Phone:
(0351) 463 31696
Office:
GLB 1-157

Referenzen

2018

Schloß, D.; Bock, K.
A CP model for a scheduling problem with limited secondary resources compared to a DES model
Proceedings of the 2018 Winter Simulation Conference, IEEE, Pages 3684-3695, December 9-12. Gothenburg, Sweden

2017

Doleschal,D.; Schöttler, E.S.
Quality Based Scheduling for an Example of Semiconductor Manufactory
Proceedings of the Winter Simulation Conference, Las Vegas, USA, December 3-6, 2017

2016

Doleschal, D.; Nieke, G.; Weigert, G.; Klemmt, A.
A CP Approach for Planning Lot Release Dates in a Supply Chain of Semiconductor Manufacturing
Proceedings of the 2016 Winter Simulation Conference, Pages: 2633-2644, Washington, D.C., December 11-14, 2016
Nieke, G.; Doleschal, D.; Weigert, G.
Mathematical Methods for Aanalyzing and Optimizing Production Lines and Supply Chains in Semiconductor Industry
Proceedings of the 39th Spring Seminar on Electronics Technology, Seiten: 336-341, Pilsen, Czech Republic, May 18-22, 2016

2015

Doleschal, D.; Weigert, G.
Scheduling under Consideration of the Machine Capability
Tagungsband der 16. Fachtagung Simulation in Produktion und Logistik, Seiten: 397-406, Dortmund, September 23-25, 2015
Doleschal, D.; Weigert, G.; Klemmt, A.
Yield Integrated Scheduling Using Machine Condition Parameter
Proceedings of the Winter Simulation Conference, Seiten: 2953-2963 Huntington Beach, California, December 6-9 2015

2014

Lange, J.; Doleschal, D.; Weigert, G.; Klemmt, A.
Scheduling Preventive Maintenance Tasks with Synchronization Constraints for Human Resources by a CP Modeling Approach
Proceedings of the Winter Simulation Conference, Washington, December 2014

2013

Doleschal, D.; Lange, J.; Weigert, G.
A Simulation Study on a Mixed Integer Based Scheduler for Secondary Resources in a Parallel Machine Work Center Problem Based on a High Mix – Low Volume Production
Proceedings of the 22th International Conference on Production Research, Iguassu Falls, Brazil,
Doleschal, D.; Weigert, G.; Klemmt, A.; Lehmann, F.
Advanced Secondary Resource Control in Semiconductor Lithography Areas: From Theory to Practice
Proceedings of the 2013 Winter Simulation Conference, Washington D.C., USA

2012

Doleschal, D.; Lange, J.; Weigert, G.; Klemmt, A.
Improving Flow Line Scheduling by Upstream Mixed Integer Resource Allocation in a Wafer Test Facility
Proceedings of the 2012 Winter Simulation Conference, Berlin, Germany
Doleschal, D.; Lange, J.; Weigert, G.
Mixed-integer-based capacity planning improves the cycle time in a multistage scheduling system
22nd International Conference on Flexible Automation and Intelligent Manufacturing

2011

Doleschal, D.; Klemmt, A.; Weigert, G.
Iterative simulation-based optimization for parallel batch scheduling problems
34th International Spring Seminar on Electronics Technology (ISSE)

Back
⇑